Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), 2223–42.

Almarri, K, Aljarman, M and Boussabaine, H (2019) Emerging contractual and legal risks from the application of building information modelling. Engineering, Construction and Architectural Management, 26(10), 2307–25.

Cajzek, R and KlanÅ¡ek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), 2474–508.

Derakhshanfar, H, Ochoa, J J, Kirytopoulos, K, Mayer, W and Tam, V W (2019) Construction delay risk taxonomy, associations and regional contexts. Engineering, Construction and Architectural Management, 26(10), 2364–88.

  • Type: Journal Article
  • Keywords: Taxonomy; Scheduling; Terminology; Delay; Systematic review; Construction planning; Project risk management; Risk paths; Regional contexts; Association rules;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-07-2018-0307
  • Abstract:
    The purpose of this paper is to systematically develop a delay risk terminology and taxonomy. This research also explores two external and internal dimensions of the taxonomy to determine how much the taxonomy as a whole or combinations of its elements are generalisable. Design/methodology/approach Using mixed methods research, this systematic literature review incorporated data from 46 articles to establish delay risk terminology and taxonomy. Qualitative data of the top 10 delay risks identified in each article were coded based on the grounded theory and constant comparative analysis using a three-stage coding approach. Word frequency analysis and cross-tabulation were used to develop the terminology and taxonomy. Association rules within the taxonomy were also explored to define risk paths and to unmask associations among the risks. Findings In total, 26 delay risks were identified and grouped into ten categories to form the risk breakdown structure. The universal delay risks and other delay risks that are more or less depending on the project location were determined. Also, it is realized that delays connected to equipment, sub-contractors and design drawings are highly connected to project planning, finance and owner slow decision making, respectively. Originality/value The established terminology and taxonomy may be used in manual or automated risk management systems as a baseline for delay risk identification, management and communication. In addition, the association rules assist the risk management process by enabling mitigation of a combination of risks together.

Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), 2289–306.

Jin, H, Liu, S, Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), 2347–63.

Kumar Singla, H (2019) A comparative analysis of long-term performance of construction and non-construction IPOs in India. Engineering, Construction and Architectural Management, 26(10), 2447–73.

Kunieda, Y, Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), 2186–205.

Kwofie, T E, Aigbavboa, C O and Machethe, S O (2019) Nature of communication performance in non-traditional procurements in South Africa. Engineering, Construction and Architectural Management, 26(10), 2264–88.

Lau, C H, Mesthrige, J W, Lam, P T and Javed, A A (2019) The challenges of adopting new engineering contract: a Hong Kong study. Engineering, Construction and Architectural Management, 26(10), 2389–409.

Loosemore, M, Sunindijo, R Y, Lestari, F, Kusminanti, Y and Widanarko, B (2019) Comparing the safety climate of the Indonesian and Australian construction industries. Engineering, Construction and Architectural Management, 26(10), 2206–22.

Oyewobi, L O, Oke, A E, Adeneye, T D and Jimoh, R A (2019) Influence of organizational commitment on work–life balance and organizational performance of female construction professionals. Engineering, Construction and Architectural Management, 26(10), 2243–63.

Qayoom, A and H.W. Hadikusumo, B (2019) Multilevel safety culture affecting organization safety performance: a system dynamic approach. Engineering, Construction and Architectural Management, 26(10), 2326–46.

Sinesilassie, E G, Tripathi, K K, Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: engineer’s perspective. Engineering, Construction and Architectural Management, 26(10), 2410–31.

Whang, S, Park, K S and Kim, S (2019) Critical success factors for implementing integrated construction project delivery. Engineering, Construction and Architectural Management, 26(10), 2432–46.

Xiong, B, Newton, S, Li, V, Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), 2170–85.